![]() |
...Phase Outside Electrical Meter Box 4 Positions For Main 20 - 40 A The CAM168-B4 is equiped with a 63Amp main safety switch along with 20-40Amp MCBs for user safety precautions. It is a result of cost-effective concept for affordable as well as durable meter boxes.It is intended for accommodation of 4 pieces single phase electric meters...
Verified Supplier
|
![]() |
...Phase 2-position IP54 electronic Energy Meter Box , Anti tampering and durable SC101-E(K) Single Phase 2-position Meter Box (anti-tampering) This meter box structure meter box,the meter box window is made of transparent PC ,and the base with ABS;The base and the cover is connected with stainless axis.Breaker , junction boxes ,relay and copper wires can all be installed in its proper position inside the meter box...
Active Member
|
![]() |
...box Meter box Educational Equipment Electrical Installation Lab 1,Product Overview 1.1 Overview This equipment includes two parts: power box and instrument box. The power box contains emergency stop button, three-phase power supply, single-phase power supply, DC power supply and motor protector; the instrument box contains AC voltage meter, AC current meter, DC voltage meter, DC current meter and Power factor meter...
Active Member
|
![]() |
...Meter Box General introduction CTKJ-F series of metering box is suitable for the meters which is AC 50Hz, 220V/380V, current 225A~ 10A. Technical specifications 1. Rated current for main bus bar In: 225A~ 10A 2. Rated short-time withstanding current for main bus bar Icw: 6kA 3. Rated voltage: Ue: 220V/380V 4. Rated insulated voltage Ui: 400V 5. Insulated resistor: not less than 20 MΩ 6. Protection rating: IP54 Main functions 1. The meter
Active Member
|
![]() |
...Meter Box - Protects and Conceals Meter ELITE Water Meter Box Product Details *Consult the information brochure, technical data sheet and specifications to get all the information on the ELITE water meter box. Product Advantages 1. Accurate measurements: Underground water meter boxes ensure precise readings, allowing for accurate billing and efficient water management. 2. Protection from external factors: These boxes
Verified Supplier
|
![]() |
...Phase Meter Test Bench SYD12 series - Basic Error Test, Creep (no-load) test, Dial (Register) Test, warm up test, start test, Error repeat test, influence quantities test, voltage dip & interruption test, etc - Harmonic test 2-21 times with analysis & display - Different meter constant on each position - Fully automatic operation by PC software and manual operation by touch screen - ICT or Latch relay (on both phase...
Site Member
|
Recommended Quality Verified Suppliers